检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]南京水利科学研究院水文水资源与水利工程科学国家重点实验室,江苏南京210029
出 处:《水利水电技术》2011年第3期49-51,69,共4页Water Resources and Hydropower Engineering
摘 要:选用起动流速与天然沙的起动流速之比与流速比尺一致的模型沙,对建于砂质粉土上的青草沙水库下游水闸的消能冲刷进行了试验研究。比较选用了在消力池末端设齿坎的辅助消能方案,冲刷程度显著减轻,为优化低Fr数水闸的消能防冲设计提供了依据。The model sand with the ratio between its incipient velocity and that of the natural sand being consistent with the ve- locity scale is selected for the experimental study on the scour from the energy dissipation for the sluice on the lower reach of Qincaosha Reservoir buih on sandy silt ; in which the scheme of the supplementary energy dissipation that arranging dentated sill at the end of the stilling pond is chosen through the comparisons concerned, and then the scouring is significantly alleviated and a good basis is also laid for the optimization of the design of the energy dissipation and anti-scouring for the sluice with lower Froude-mumber.
分 类 号:TV13[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171