检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]九江学院土木与城建学院,江西九江332005 [2]中铁大桥局集团有限公司五处,江西九江332000
出 处:《江苏海洋大学学报(人文社会科学版)》2011年第4期30-31,共2页Journal of Jiangsu Ocean University(Humanities & Social Sciences Edition)
摘 要:投标报价是发包人选择中标人的重要标准,也是发包人与承包商签订承包合同的主要依据,故报价是工程投标工作的核心。要想在有限的时间内实现快速、有效的报价,报价人员不仅要有技术经济方面的知识、报价的技巧和策略,还应重点关注报价工作程序中的两个重要环节:熟悉招标资料,提列疑难问题清单和认真分析计算大型临时设施的工程量清单。The tender offer is an important criterion for the employer to select the developers,which is also the key reference for them when making the contract,so the tender offer is the core of tender engineering.In order to achieve rapid and effective bid,the bidder should have not only a good command of economic techniques,bidding skills and strategies,but also two major links in tender offer,namely,to be familiar with the bidding materials,and to list the insuperable problems and the engineering quantity for large temporary facilities with careful calculation and analysis.
分 类 号:TU721[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229