检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张垚垚[1] 周舟[1] 杨庆第[1] 高晓桦[1]
出 处:《国土资源信息化》2010年第6期130-132,共3页Land and Resources Informatization
摘 要:金土工程一期项目涉及数据中心、数据库应用系统、网络安全和标准等建设,工期两年。作为一项大型电子政务项目,从立项、设计到实施建设,形成了大量的文件资料,做好这些资料的收集整理与管理,不仅对提高项目管理水平,而且对今后成果应用、运行、维护,及进一步扩展、完善,都具有十分重要的意义。本文通过对金土工程一期项目中档案资料的搜集整理、管理、利用等方面进行阐述,探讨电子政务工程档案管理工作方法。The phaseⅠof Jintu project with the time period of two years.A massive reference material will be generated from initiating the project,approval,design to implementation and construction as a large-scale E-government affairs project.It has very vital significance to complete well for the collections and managements of these files which are not only enhance the levels of project management but also promote application results,run and operation,maintenance and further expansion and perfection for the present and future projects.This article is based on elaboration of the massive references in the project of the phaseⅠof Jintu,through collecting,managing,utilizing and other aspects to discuss the methods of the file management of E-government affairs project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117