检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨通录[1] 陈赞成[2] 徐尚株[1] 于跟波[2] 门瑞营[2]
机构地区:[1]西部矿业股份有限公司锡铁山分公司,青海格尔木816203 [2]北京科技大学土木与环境工程学院,北京100083
出 处:《工程爆破》2011年第1期35-38,共4页Engineering Blasting
摘 要:锡铁山铅锌矿深部五中段35勘探线以东采场上盘围岩稳定性较差,针对这一难题,对该中段东部的501采场采用了挤压爆破崩落采矿法进行回采。崩落的矿石对采场围岩起到了很好的支撑作用,从而有效地控制了围岩的大面积冒落,取得了较好的效果,为类似矿山的安全生产提供借鉴。The stability of hanging wall surrounding rock of the stope located the east of 35 exploration line at 5 level of Xitie Mountain lead-zinc mine is poor.According to this problem,the extrusion blasting caving mining method was applied in 501 stope located the east of 5 level.The caved rocks played a very good supporting function on surrounding rock of the stope,thus the large area surrounding rock falling have gotten effective control and good effect was obtained,which can be referred by safety production of the similar mine.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.89.50