三峡工程电站尾水管顶板整浇方案温度应力研究  被引量:1

Study on Thermal Stress of Monolithic Pouring Scheme for Draft Tube Roof of TGP's Power Plant

在线阅读下载全文

作  者:徐跃之[1,2] 邹启新[1,2] 

机构地区:[1]长江水利委员会设计院枢纽处 [2]长江科学院材料结构研究所

出  处:《长江科学院院报》1999年第4期28-30,34,共4页Journal of Changjiang River Scientific Research Institute

摘  要:为了降低三峡电站厂房尾水管施工中出现的温度应力,原设计推荐采用传统的设置“封闭块”方案;但该方案施工进度慢。本文介绍了设置和取消“封闭块”两种工况的应力仿真计算结果,提出了取消“封闭块”,实施整浇顶板的建议。For reducing the thermal stress in monolithically poured draft tube roof of TGP's power plant emerging in construction, a conventional “confined block” scheme was recommended in the original design, but the construction progress of this scheme is rather slow. The results of two simulated calculation with and without “confined block” are represented in the paper. A suggestion of implementing monolithical pouring without “confined block” is proposed.

关 键 词:尾水管 整浇顶板 封闭块 混凝土 水电站 厂房 

分 类 号:TV731[水利工程—水利水电工程] TV544

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象