检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《路基工程》2011年第2期30-33,共4页Subgrade Engineering
基 金:铁道部科技研究开发计划重大课题:京沪高速铁路桥梁桩基后注浆技术试验研究(2008G032-3)
摘 要:以往对于桩基后注浆技术的研究大多局限于单桩,而目前各类工程中桩基础的结构形式是群桩所占比重大,在设计上都以变形控制为主。使用FLAC3D有限差分软件,针对京沪高速铁路桩基后注浆试验段中群桩基础在正常使用状态下的计算机模拟静载试验,研究其荷载-沉降规律,验证在设计荷载作用范围内,群桩桩端注浆减小群桩基础沉降量的效果。The previous studies on pile foundation post-grouting technology are mainly limited to single pile.However,group pile is the major structure of pile foundation in engineering at present,which is designed based on deformation control.According to computer simulation static test of group pile foundation in Beijing-Shanghai high-speed railway post-grouting test section under normal state,the load-settlement law is studied using FLAC3D finite difference software.It is verified the effect of pile tip grouting on reduction of group pile foundation settlement within design load.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.19.244.116