作 者:翁振华[1]
机构地区:[1]中铁十八局集团第三工程有限公司,河北涿州072750
出 处:《路基工程》2011年第2期169-171,共3页Subgrade Engineering
摘 要:中天山隧道为双单线隧道,是国内少数几座特长大隧道之一,进口采用TBM掘进,出口为钻爆法施工。在出口五千多米的位置设置了一条2547 m长的单车道斜井,坡度为11.3%。着重介绍斜井通风方案的比选及相应措施的施工技术。通过实践表明,采用大功率风扇通风接力排烟方案简便、可行,效果良好,为类似特长大隧道斜井的通风排烟积累了施工经验。Zhongtianshan Tunnel is a double-hole single-line tunnel,which is one of the several extra-long tunnels in China.The entrance is bored by tunnel boring machine(TBM) and the exit is drilled using borehole blasting method.A 2 547m-long single-lane inclined shaft is set up at over 5 000m from the exit,with gradient of 11.3 %.This paper emphasizes comparison of inclined shaft ventilation programs and construction technology of the corresponding measures.The practice shows that large-power fan is simple and feasible,and has good effect for ventilation and exhaust,which accumulated construction experience for inclined shaft ventilation and exhaust in the similar extra-long tunnels.
关 键 词:特长大隧道 单车道斜井 大风扇排烟 施工技术 比选
分 类 号:U453.5[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117