检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:肖红光[1]
机构地区:[1]国家电力公司昆明勘测设计研究院,云南昆明650051
出 处:《云南水力发电》1999年第3期10-12,共3页Yunnan Water Power
摘 要:螺丝湾电站引水隧洞总长5041 m ,沿线主要为二迭系玄武岩,岩石坚硬。但断层、挤压破碎带及裂隙发育,据开挖揭露出的大小断层共50 条,挤压破碎带183 条,隧洞经过这些地段,对围岩稳定有一定影响。总的说开挖前对地层岩性、地质构造。The power tunnel of the Luosiwan hydropower station, 5,041m long, is located in an area that consists mainly of Permian hard basalt, and is however characterized by developed faults, compressive fractured zones and fissures. Altogether 50 large and small faults and 183 compressive fractured zones were exposed during excavation. The rock excavation for the tunnel had certain impact on its surrounding rocks. The assessment of strata rock properties, geological structure, engineering geology and hydrogeology made before excavation is in line with that exposed after excavation.
分 类 号:TV732.3[水利工程—水利水电工程] P642[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117