检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国给水排水》2011年第8期47-51,共5页China Water & Wastewater
摘 要:介绍了汉沽污水库现场试验工程采用环保疏浚联合土工管袋的方式,对底泥进行清淤和脱水减容的工程实例,主要内容包括环保疏浚设计、脱水减容场地准备、土工管袋选型、土工管袋充填、絮凝剂投加等。通过对本工程的设计和全过程跟踪实践,摸索出环保疏浚联合土工管袋用于湖库底泥脱水减容的设计参数和操作流程,为今后规模化应用奠定了基础。The engineering case of using environment-friendly dredging with geotextile tubes for dredging, dewatering and volume reduction of sediments in Hangu Sewage Reservoir is introduced. It mainly includes design of environment-friendly dredging, preparation of dewatering and volume reduction site, selection of the geotextile tubes, filling of geotextile tubes, dosing of the flocculant and so on. Through the design and whole process practice of this engineering, the design parameters and process of environment-friendly dredging with geotextile tubes for dewatering and volume reduction of sediments in lake and reservoir are found to lay the foundation for its large-scale application in the future.
分 类 号:X703.1[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249