闽江水口水电站尾水壅水堰模型试验研究  被引量:3

Experimental Study on Backwater Weir for Shuikou Hydroelectric Station of Minjiang River

在线阅读下载全文

作  者:陈野鹰[1] 刘开佳[1] 彭凯[1] 扈晓雯[2] 

机构地区:[1]重庆交通大学河海学院,重庆400074 [2]中国水电顾问集团华东勘测设计研究院,浙江杭州310014

出  处:《重庆交通大学学报(自然科学版)》2011年第1期120-123,共4页Journal of Chongqing Jiaotong University(Natural Science)

基  金:重庆市自然科学基金资助重点项目(CSTC2009BA6001)

摘  要:尾水壅水堰是电站尾水位下降整治中一种全新的工程措施。根据模型试验观测结果,研究了在闽江水口水电站尾水渠修建壅水堰后尾水渠水位变化及近坝河段的水流条件变化。结合地形、地貌、尾水渠的特点对原方案堰轴线进行旋转得到了3个修改方案并进行了优化,其模型试验结果分析表明:优化方案的各项水力要素满足工程要求。Backwater weir is an absolutely new engineering measure which can regulate the tail water level in the power station tailrace.The tailrace water level change in the Minjiang Shuikou power station tailrace after the construction of the tail water backwater weir and the flowing conditions change near the dam tailrace are studied by the hydraulic model tests.Combining with topography and the characteristics of the tailrace,the weir axis of the original scheme is rotated to obtain 3 amending proposals and then the 3 proposals are optimized.The model test results show that various hydraulic elements of the optimization program meet the engineering requirements.

关 键 词:水口水电站 尾水壅水堰 水工模型试验 

分 类 号:TV74[水利工程—水利水电工程] TV697.1

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象