高温高固气质量比条件下旋风预热器换热管压降的研究  

Investigation on Pressure Drop in Heat Exchange Tube of Cyclone Preheater at High Temperature and High Mass Ratio of Solid and Gas

在线阅读下载全文

作  者:杨沛浩[1] 陈延信[1] 范海宏[1] 赵博[1] 

机构地区:[1]西安建筑科技大学粉体工程研究所,陕西西安710055

出  处:《中国粉体技术》2011年第2期40-43,共4页China Powder Science and Technology

摘  要:为了掌握旋风预热器换热管压降随温度、风速和固气质量比的变化规律,在各种不同条件下,对旋风预热器换热管压降进行测试。结果表明:在气流速度固定不变的情况下,当固气质量比z≤1时,随着温度的升高,压降先增大后减小,在200℃附近出现高点;当固气质量比z≥1.5时,随着温度的升高,压降逐渐减小,在600℃附近趋于平缓,之后随着温度的升高略有增大。压降总是随着风速的提高而增大,随着固气质量比的增加而增大。In order to understanding the pressure drop in heat exchange tube of cyclone preheater varying with temperature, gas velocity and mass ratio of solid and gas, the pressure drops were measured in all kinds of conditions. The results showed that in the case of the mass ratio of solid and gas z ≤1, the pressure drop increased with the gas temperature at a given gas velocity and the gas temperature was lower than 200 %. When the gas temperature was 200 ℃, the pressure drop reached a maximum. Then the pressure drop decreased when the temperature further increased. In the case of a fixed gas velocity and the mass ratio of solid and gas z≥ 1.5, the pressure drop decreased slowly with the gas temperature and reached a minimum at 600℃. Then the pressure drop increased slightly when the temperature further increased. The pressure drop in heat exchange tube always increased with the gas velocity and the mass ratio of solid and gas increasin.

关 键 词:旋风预热器 换热管 压降 

分 类 号:TQ172.622.24[化学工程—水泥工业]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象