厚煤层综放开采地表下沉速度观测研究  被引量:15

Observation and Study on Surface Ground Subsidence Speed of Fully Mechanized Top Coal Caving Mining in Thick Seam

在线阅读下载全文

作  者:郭文兵[1] 黄成飞[1] 陈俊杰[1] 

机构地区:[1]河南理工大学能源科学与工程学院,河南焦作454000

出  处:《煤炭科学技术》2011年第4期114-117,共4页Coal Science and Technology

基  金:国家自然科学基金资助项目(50974053)

摘  要:为了取得厚煤层综放开采地表下沉速度等参数,通过建立地表移动观测站,对厚煤层综放开采引起的地表沉陷情况进行了观测,分析了厚煤层综放开采条件下地表下沉特征,得出了地表下沉系数为0.91;起动距50~60 m,为采深的1/5~1/6;超前影响距为183 m。在此基础上,得出了地表最大下沉速度及最大下沉速度滞后角分别为51 mm/d和76.3~78.3°,表明该区域厚煤层综放开采条件下地表移动剧烈、地表下沉速度快、起动距偏小等特点。In order to have the surface ground subsidence speed and other parameters of the fully mechanized top coal caving mining in the thick seam,with the establishment of the surface ground movement observation station,the surface ground subsidence occurred by the fully mechanized top coal mining in the thick seam was observed and the surface ground subsidence features under the conditions of the fully mechanized top coal caving mining in thick seam were analyzed.From the observation and analysis,the surface ground subsidence coefficient obtained was 0.91.The starting distance was 50~60 m and would be 1/5~1/6 of the mining depth.The advance influence distance was 183 m.Based on the circumstance,the max subsidence speed and the max subsidence speed delay angle of the surface ground would be 51 mm/d and 76.3~78.3° individually.The above showed that under the fully mechanized top coal caving mining in thick seam,the surface ground in that area would have a serious movement,a quick subsidence speed,a small starting distance and other features.

关 键 词:厚煤层 综放开采 地表沉陷 地表下沉速度 地表移动观测站 

分 类 号:TD325.4[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象