基于复利法的露天矿山生产设备优化配置  被引量:3

Optimized Configuration of Mechanical Equipment in Open-Pit Mines Based on the Compound Interest Method

在线阅读下载全文

作  者:吴长振[1] 戴剑勇[1] 杨仕教[1] 

机构地区:[1]南华大学

出  处:《金属矿山》2011年第4期108-110,共3页Metal Mine

基  金:湖南省自然科学基金项目(编号:10JJ2041);国家自然科学基金项目(编号:50974076)

摘  要:考虑到资金使用的时间价值,依据复利法的折旧方式以及矿山生产规模与设备生产能力的关系,结合矿山的实际情况,运用整数规划及Matlab软件解决露天矿山在生产规划阶段主体机械的设备型号、数量选择的优化配置问题,进而使矿山取得较好的经营效益,为基建期的矿山企业优化机械设备提供了一种新思路。Considering the time value of funds,based on the depreciation method of compound interest and the relationship between mine production scale and equipment capacity and actual conditions of mines,the paper solves the optimized configuration problem about the type of main mechanical equipment and the quantity by applying integrated planning and Matlab software at the preliminary scheduling phase.This optimized configuration scheme brings better benefits for mining enterprises and provides a new idea about optimized configuration of equipment in capital construction phase of mine.

关 键 词:复利法 矿山规模 设备优化配置 设备生产能力 资金的时间价值 

分 类 号:TD861.1[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象