检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国瑞林工程技术有限公司 [2]中南大学
出 处:《金属矿山》2011年第4期144-148,共5页Metal Mine
基 金:国家自然科学基金项目(编号:50774092);全国优秀博士学位论文作者专项基金项目(编号:200449)
摘 要:深井开采是解决矿石供给矛盾最有效的途径,然而深井热害严重危及采矿作业的进行。分析总结了目前国内外深井热害控制方面的研究成果与努力方向,对深井热害的来源及治理措施进行了归纳和比较。结合国外某深井高温金铜矿山的开采条件,综合权衡各种因素确定其热害治理方案。采用地面冷却进风方式消除巷道余热,采用水冷却系统处理独头掘进工作面热害,为国内高温开采矿山提供理论支持和技术借鉴。Deepwell mining is the most effective solution to resolve the conflict of ore supplies.However,deepwell heat-harm has been endangering the mining seriously.The research results and the current striving direction on control of deepwell heat-harm at home and abroad are analyzed and summarized,and the origin of deepwell heat-harm and its control measures are concluded and compared.Combining with mining conditions in a foreign deep gold-copper mine with high temperature,the control schemes for heat-harm are determined by weighing various factors comprehensively.And waste heat in roadway is eliminated by using cooled inlet wind on the ground,and the water cooling system is applied to treat heat-harm of dead working face,thus providing theoretical support and technical reference for domestic mine with high-temperature.
分 类 号:TD85[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30