三峡梯级水利枢纽2010年“7·20”洪水调度  

Dispatch of "7·20" flood in 2010 from Three Gorges Cascade Water Control Project

在线阅读下载全文

作  者:欧阳德和 蔡杰[1] 杨波[1] 

机构地区:[1]三峡水利枢纽梯级调度通信中心,湖北宜昌443133

出  处:《水利水电技术》2011年第4期74-76,共3页Water Resources and Hydropower Engineering

基  金:国家科技支撑计划(2009BAC56B03)

摘  要:2010年7月中旬,三峡水库出现了建库以来最大的洪水过程,在国家防汛抗旱总指挥部和长江防汛抗旱总指挥部的科学调度下,取得了防洪、发电和航运的全面胜利,充分发挥了枢纽工程的综合效益和社会效益。During mid-July 2011, the maximum flood since the complete of Three Gorges Project occurred in the reservoir. Under the scientific dispatch of both the State Flood Control and Drought Relief Headquarters and the Yangtze River Flood Control and Drought Relief Headquarters, all the tasks of flood control, power generation and navigation were successfully fulfilled by the project, and then the comprehensive benefits and social benefits from the project were fully played as well.

关 键 词:三峡梯级枢纽 “7·20”洪水 科学调度 

分 类 号:TV697.21[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象