小湾水电站堆积体边坡支护与锚索技术应用  被引量:8

Reinforcing of deposit slopes of Xiaowan Hydropower Station and application of prestressed anchorage cables

在线阅读下载全文

作  者:张德圣[1] 姜玉松[1] 吴诗勇[2] 

机构地区:[1]安徽理工大学土木建筑学院,安徽淮南232001 [2]安徽理工大学地球与环境学院,安徽淮南232001

出  处:《水利水电科技进展》2011年第2期66-70,共5页Advances in Science and Technology of Water Resources

基  金:安徽理工大学博士科研启动基金(11050)

摘  要:分析小湾水电站堆积体边坡支护措施,研究预应力锚索技术的应用。分析认为,研究区边坡支护综合运用了工程护坡和生态护坡等边坡处理技术,预应力锚索是其主体工程,锚索孔钻孔和灌浆是该技术应用中的难点和重点,使用偏心跟管钻进技术和同心跟管钻进技术能有效解决钻孔难以成孔的问题;通过在锚索体外裹土工布和细帆布的方法,既保证了水泥结石对自由段锚索体的保护,又减少了浆量损耗,避免浆体浪费。With regard to the deposit slopes of Xiaowan Hydropower Station,the relevant reinforcing measures were analyzed,and the application of prestressed anchorage cables was highlighted.The results indicate that the slope reinforcements in the study area comprehensively adopt engineering protection and ecological protection techniques.The pre-stressing anchorage cables are the principal part of the engineering,and their drilling and grouting are the difficulty and keystone of the anchorage technology.The technology of concentric drilling and eccentric drilling with pipes can availably solve boring problem.By wrapping geotextile and thin canvas outside the prestressed steel strand,it can make concrete calculi protect steel strand of tensile section and reduce grouting quantity so as to avoid grouting waste.

关 键 词:小湾水电站 堆积体边坡 支护技术 预应力锚索 

分 类 号:TV223[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象