检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]云南鲁布革顾问有限公司,云南昆明650051 [2]武汉大学水资源与水电工程科学国家重点实验室,湖北武汉430072
出 处:《水力发电》2011年第4期46-50,共5页Water Power
摘 要:冶勒大坝为沥青混凝土心墙堆石坝,最大坝高124.5 m,坝基地质条件极其复杂。该坝址距"5.12"汶川大地震震中约258 km,地震发生时坝区震感强烈。从渗流量及渗流场变化、坝基覆盖层液化和防渗墙地质雷达检测结果等3个方面分析评价了汶川地震对冶勒大坝右岸抗渗稳定性的影响。结果表明:汶川地震对冶勒大坝右岸局部地层确有轻微影响,但防渗墙未出现横向贯穿性裂缝;坝基覆盖层在地震主震作用下不会发生液化;右岸整体抗渗稳定性并未受到实质性影响。The Yele rockfill dam with an asphalt concrete core wall has a maximum height of 124.5 m and the geological condition of its foundation is extremely complex. The dam site is about 258 km to the epicenter of Wenchuan Earthquake and has a strong shock during earthquake. The impermeability stability of the right bank of dam was analyzed from the changes of seepage quantity and flow field, the liquefaction of overburden on dam foundation and the testing results of Ground Penetrating Radar for cut-off wall. The results show that the Earthquake just has a slight influence on local strata, there is no lateral crack passing through the cut-off wall and no liquefaction in overburden, and the overall impermeability stability of the right bank has not been substantially affected.
分 类 号:TV223.7[水利工程—水工结构工程] TV641.41
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15