机构地区:[1]中铁隧道集团,河南洛阳471009
出 处:《人民长江》2011年第8期70-76,共7页Yangtze River
基 金:"十一五"国家科技支撑计划项目"复杂地质条件下穿黄隧洞工程关键技术研究"(2006BAB04A11)
摘 要:南水北调中线工程穿黄隧洞为大型水工隧洞,位于地震区,采用盾构法施工。盾构隧洞工程的施工难点是进、出洞段的施工和不同复杂地层的开挖。针对施工难点,在始发洞段,采取地层加固和气囊密封技术,在各种地层中施工时,根据地层情况,选择相应的施工参数,并采取了短边控制长边测量等关键技术,保证了施工的顺利进行。隧洞施工完成后,经检测,隧洞路线贯通精度高,误差仅25 mm,远低于50 mm的设计要求。Located in an earthquake area,the tunnel crossing Yellow River of the Middle Route Project of South-to-North Water Diversion(MRP-SNWD) is a large-type one and it is constructed by slurry shield machine.The difficulty of shield machine construction is the excavation in the sections of tunnel entrance and exit,and different geological layers.As a result,some key technologies were applied: at the starting section,soil reinforcement and airbag sealing were adopted;in the different geological layers,corresponding construction parameters were selected and the measurement of long-side controlled by short-side was used.The application of these technologies makes the construction go smoothly.The check after construction indicated that the tunneling-through deviation was small with only 25mm,lower than the design requirement of 50mm.
关 键 词:穿黄隧洞 泥水盾构 复杂地层 气囊密封 测量控制 南水北调工程
分 类 号:TV67[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31