检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《华东电力》2011年第4期519-523,共5页East China Electric Power
基 金:国家自然科学基金资助重点项目(50539140);国家自然科学基金资助项目(50679098);国家科技支撑计划基金资助项目(2008BAB29B09);美国能源基金会"中国可持续能源"基金资助项目(G-0610-08581)~~
摘 要:针对担负多种综合利用要求的流域梯级水电站群,提出了满足各种综合利用要求约束的中长期优化调度数学模型,考虑到综合利用约束与常规约束条件的不同之处,采用一种POA改进算法求解模型。并将该模型应用于红水河流域梯级电站群,计算结果合理,方法可靠有效,提高了梯级水电站的经济效益和综合利用效益。This paper establishes a mid-long term optimal operation model for cascaded hydropower stations within the various constraints for comprehensive utilizations.Taking into account the differences between conventional constraints and comprehensive utilization constraints,a modified Progressive Optimality Algorithm(POA) is used to solve the model.The model has been applied in the cascade hydropower stations along Hongshui River.The reasonable calculation results verify that the reliable and effective model is conducive to improving the economic benefit and comprehensive utilization benefit of cascade hydropower stations.
关 键 词:梯级水电站群 综合利用要求 中长期优化调度 POA改进算法
分 类 号:TM612[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170