涌溪三级电站大坝碾压混凝土夏季施工  被引量:1

Construction of Roller Compacted Concrete Dam During Summer Time for the Yongxi-ⅢHydropower project

在线阅读下载全文

作  者:涂志军 

机构地区:[1]中国水利水电第十四工程局大理分局

出  处:《云南水力发电》1999年第2期4-7,共4页Yunnan Water Power

摘  要:涌溪三级电站碾压混凝土坝无法避开福建的高温季节施工,为突破高温(最高达37℃)与温差大(夜间为15.5C)的施工禁区,必须采用相应的有力措施。水电十四局涌溪项目部在做了大量试验成果基础上,采取相应措施,获得良好效果。The construction of the roller compacted concrete dam of the Yongxi-III Hydropower Project had to be carried out even during the high-temperature seasons in Fujian Province where the difference in air temperature ranges from a maximum of 37℃ to 15.5℃. In order to assure the quality of the dam construction the China Fourteenth Water Conservancy and Hydropower Construction Bureau took some necessary and practicable measures based on the tests and achieved successful results.

关 键 词:碾压混凝土 碾压混凝土坝 施工措施 水电站 夏季 

分 类 号:TV544.921[水利工程—水利水电工程] TV642.2

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象