检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:汪树玉[1] 刘国华[1] 杜王盖[1] 石教英 董峰
机构地区:[1]浙江大学水工结构及水环境研究所 [2]CAD/CG国家重点实验室
出 处:《水利学报》1999年第7期22-26,共5页Journal of Hydraulic Engineering
摘 要:本文探讨大坝观测数据中的混沌现象.文中对坝体径向位移的实测值与残差的数据序列,分别进行相空间重构,将若干固定时间延迟点上的测量作为新维处理,形成相点,按照关联维数方法求算吸引子维数.计算中对数据进行规格化处理,所得吸引子维数为31~35.不同测点上的测值与不同起始时刻的计算结果比较接近与稳定.文中还绘制了实测值与残差序列的相轨线图,它们均与白噪声序列的轨线形状有明显不同.初步表明观测数据中存在有奇异吸引子.The chaotic phenomenon in observation data of dam monitoring is discussed.The data series of observed vaules and their residual errors are reconfigured in phase space respectively and the observed values at the points of certain time delay are handled as new dimensions.Thereby phase points are formed.The dimension amount of the attractor can be calculated according to the correlation dimension method.The calculated results shows that the dimension of the attractor obtained is in the range from 3 1 to 3 5.It seem that the phase traces in the plots of observed values and residual error series are different from white noise trace.These indicate that the strange attractor may exist in the observation data series.
分 类 号:TV698.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38