东周窑矿斜井施工模拟优化研究  被引量:1

Research on Simulation Optimization for Construction of Inclined Shaft in Dongzhouyao Mine

在线阅读下载全文

作  者:宁掌玄[1] 马迎松[1] 马志明[1] 

机构地区:[1]山西大同大学煤炭工程学院,山西大同037003

出  处:《水利与建筑工程学报》2011年第2期15-19,共5页Journal of Water Resources and Architectural Engineering

基  金:山西省科学技术发展计划基金项目(20080321068):斜井掘进机械化作业线的动态模拟研究

摘  要:通过对同煤集团东周窑矿副斜井施工实测数据的统计分析,应用斜井施工优化分析系统对其进行了实际的模拟试验,模拟结果与实际结果月偏差率最大不超过10%,长期偏差仅为0.47%,充分证明模拟模型的建立是正确的、可靠的。通过对模拟结果的系统分析,可以快速地对系统进行诊断,发现系统问题之所在,便于寻找施工优化之途径。在此模拟基础上,进一步对其实际工程进行了优化研究,提出了优化的方案,并进行了模拟试验,试验结果远远胜于实际施工效果,证明了斜井施工模拟优化分析系统具有诊断、预测、优化的功能。斜井施工模拟优化分析系统的开发对于斜井的科学施工具有积极的促进作用。Based on the analysis of a large number of data collected in the construction of subsidiary inclined shaft in Dongzhouyao Mine of Datong Coal Mine Group,the practical simulation tests are made by using the optimization analysis system.By comparison of simulation results with actual results,it is known that the largest error rate does not exceed 10%,and the long-term deviation is only 0.47%,which could prove that the simulation model is correct and reliable.Through systematic analysis for the simulation results,the system could be quickly diagnosed,and the problems in the system could be found out so as to obtain the effective ways for optimization construction.On the basis of the simulation,the further optimization and researches are made to the actual works,then an optimization scheme is proposed,meanwhile the simulation tests are made,and the simulation results are far better than actual results,proving that the optimization analysis system for the construction of inclined shaft has the diagnosis,prediction and optimization functions.The developing of the optimization analysis system has a positive role in promoting the scientific construction of inclined shaft.

关 键 词:斜井施工 优化分析系统 模拟模型 方案设计与优化 

分 类 号:TD262.12[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象