检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学力学与材料学院,江苏南京210098 [2]江苏省水利厅基建处,江苏南京210029 [3]江苏省盐城市水利工程管理处,江苏盐城224000
出 处:《水利与建筑工程学报》2011年第2期40-43,53,共5页Journal of Water Resources and Architectural Engineering
基 金:江苏省水利科技重点项目(2008018)
摘 要:试验结合闸墩混凝土温度裂缝控导研究,进行现场混凝土温度和应变观测。依据观测结果,分析了大体积混凝土早期温度和应变的分布及变化规律,混凝土中心层和表面层应变与温差的变化关系。计算结果表明,由于温度应力大于混凝土实际抗拉强度,导致混凝土产生裂缝。表层混凝土应变实测值与理论计算值结果相近,变化趋势相同。Combined with the research of controlling and conducting the thermal cracking on gate pier concrete,the observation is made for the temperature and strain of concrete on site.Based on the results,the analyses are made here for the distribution and change regularity of early temperature and strain,the process of rising and decreasing of temperature,and the change relationship of the center concrete to surface concrete.The results of calculation show that the thermal stress is more than the tensile strength,which would result in concrete cracking.The measured value of strain on concrete surface layer is close to the theoretical value of calculation,and the change trend is similar.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117