检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏祖涛[1] 周峰[1] 侍克斌[1] 王国强[1] 陕强[1]
机构地区:[1]新疆农业大学水利与土木工程学院,新疆乌鲁木齐830052
出 处:《水资源与水工程学报》2011年第2期55-57,共3页Journal of Water Resources and Water Engineering
基 金:国家自然科学基金项目(50969010)
摘 要:在高山峡谷河流上修建土石坝,若溢洪道布置在岸坡上,开挖工程量会很大。为节约工程造价可将溢洪道直接布置在坝体上。坝体溢洪道的泄槽一般都比较陡,为确保其稳定性现对泄槽底板进行多层水平锚筋加固。通过对泄槽底板的稳定分析得出锚筋的数量和长度与其受力的关系式,为今后工程设计提供理论依据。When building earth-rock dam in river of high canyon,the excavation quantities of spillway will be very large.For saving project cost,the spillway can be directly plan on the dam,the chute of the spillway is generally more steep.In order to ensure its stability,to strengthen the base plate of spillway with multilayer level anchor rods is necessary.Through the stability analysis for the base plate,we can also obtain the relationship formula between the numbers and length of anchor rods and the stress.It can provide a theoretical basis for the future project design.
分 类 号:TV651.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.15.225.105