临时断面挡水度汛对面板堆石坝应力变形的影响分析  被引量:2

Analysis of influnce of Temporary section retaining water on stress deformation of CFRD

在线阅读下载全文

作  者:崔自力[1] 王瑞骏[1] 付国栋 薛霄[3] 陈前玲[1] 

机构地区:[1]西安理工大学水利水电学院,陕西西安710048 [2]贵州省水利水电工程咨询中心,贵州贵阳550300 [3]中国水电顾问集团西北勘测设计研究院,陕西西安710065

出  处:《水资源与水工程学报》2011年第2期132-136,共5页Journal of Water Resources and Water Engineering

摘  要:基于非线性邓肯E-B模型,以洪家渡面板堆石坝工程为例,建立有限元计算模型。运用中点增量法,针对施工期利用临时断面挡水和不挡水两种工况,实际模拟坝体的施工填筑过程及其临时断面的挡水度汛过程,通过对两种工况下大坝竣工期应力变形的计算与比较,探讨了临时断面挡水度汛对于大坝应力变形的影响机理。结果表明:临时断面挡水度汛对于大坝竣工期应力变形的影响是有限的,采用临时断面挡水度汛施工方案是可行的。Taking the project of Hongjiadu CFRD as an example,on the base of nonlinear DFuncan-chang E-B model,the paper established the finite element model.By using midpoint incremental method,aim at the two conditions of whether to use temporary section retaining water in construction period,discussed the temporary section retaining water for dam deformation and stress influence under the conditions of dam completion period stress deformation and stress influence under the conditions of dam completion period stress deformation calculation and comparison.Results showed than the influence of the mporary section retaining water dam deformation and stress of completion period is limited,using provisional cross-section retaining water flood construction scheme is feasible.

关 键 词:混凝土面板堆石坝 临时断面 挡水 应力变形 非线性 

分 类 号:TV314[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象