检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨绍文[1] 曹耀华[2] 刘红召[1] 高照国[1]
机构地区:[1]中国地质科学院郑州矿产综合利用研究所,郑州450006 [2]国家非金属矿资源综合利用工程技术研究中心,郑州450006
出 处:《有色金属(冶炼部分)》2011年第5期31-33,共3页Nonferrous Metals(Extractive Metallurgy)
基 金:国土资源部公益性行业科研专项经费项目(200811062)
摘 要:某低品位铅钼粗精矿中(含钼4.39%)钼主要以钼酸铅矿物形式存在,采用硫化钠浸出工艺提取氧化钼。在粒度-74μm占83%、硫化钠用量为理论量的2.5倍、液固比3∶1、浸出温度90~95℃、浸出时间1 h的条件下,钼浸出率85%,铅以硫化铅形式进入浸出渣,实现了钼酸铅矿中钼铅的分离。The molybdenum in lead concentrate(Mo content of 4.39%) mainly existed in forms of PbMO4.The sodium sulfide leaching process was adopted for oxidation molybdenum extraction.The leaching rate of molybdenum was 85% under the conditions that particle size of ore was 83%-0.0074 mm,the dosage of sodium sulfide was two times as the theoretical value,the ratio of liquid(volume) to solid(mass) was 3∶1,the leaching temperature was 90~95 ℃ and the leaching lasted 1 h.So,Lead was remained in the leaching slag in the form of lead sulfide,and the separation of lead and molybdenum was achieved.
分 类 号:TF841.2[冶金工程—有色金属冶金]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.216