机构地区:[1]华南理工大学土木与交通学院,广州510640
出 处:《工程勘察》2011年第5期26-31,共6页Geotechnical Investigation & Surveying
摘 要:封桩是锚杆静压桩施工中重要的环节之一,封桩质量的好坏直接关系到锚杆静压桩的施工效果。针对传统锚杆静压桩的不足之处并结合工程实践,对封桩技术提出了改进措施:增加四根封桩锚杆,将传统技术中锚杆四根一侧成对布置改为八根两侧成对布置;压桩到最后一节时,在桩顶加一节短槽钢或工字钢,在桩压到指定位置后,通过新增的型钢梁与锚杆使压桩力继续作用在桩顶,然后再撤去千斤顶进行封桩。工程案例表明,改进的方法既提高了压桩架和千斤顶的周转速度和使用效率,又有效地降低了卸荷后桩顶的回弹效应,为类似工程提供了参考经验。Sealing pile is one of the important processes in construction of anchor jacked pile,whose quality may have a direct impact on construction effect.The conventional anchor jacked pile is improved by the following procedures: four added sealing pile bolts are fixed on one side of static pressure pile hole;a short piece of channel steel or I-steel is placed on the top of pile when the last pile segment is pressed into the designed depth.The newly-adding steel beam and the sealing pile bolts work jointly,continuously imposing load on the top of pile.Then the hoisting jack combined with pile-driving frame is removed and sealing pile is carried out.Engineering case reveals that not only are the turn-over speed and efficiency of equipments enhanced but also the rebound effect of pile head after being unloaded decreases,which is valuable and available for similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3