检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖北省电力试验研究所,武汉市430077 [2]湖北省电力局生产处,武汉市430077
出 处:《电网技术》1999年第11期67-70,共4页Power System Technology
摘 要:葛洲坝换流站连续两次在雷雨天气中发生直流滤波器中电流互感器损坏事故。文章综述了对损坏设备的分解,过电压计算及分析,并提出了在12/36 次谐波滤波器处改用220kV 电流互感器,在12/24 次谐波滤波器处加220kV 电压等级避雷器作相应保护的对策。In thunderstorm two of the current transformers in Gezhouba converter station were damaged one after another. The disassembly, inspection, overvoltage calculation and analysis of the damaged CTs are summarized. It is put forward that in the place where the 12/36th harmonic filters are installed the filters should be replaced by 220kV CTs, and in the place where the 12/24th harmonic filters are installed the 220kV lightning arresters should be added. The operational experience shows that the above mentioned protective countermeasures are successful.
分 类 号:TM63[电气工程—电力系统及自动化] TM452.07
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3