储煤场框架柱、梁机械伤害后加固修复设计及施工实践  被引量:2

Rehabilitation and reinforcement design and construction practice for mechanical damage of column and beam of coal storage yard framework

在线阅读下载全文

作  者:李斌宇[1] 边艳春 

机构地区:[1]太原东山煤矿有限责任公司,山西省太原市030043

出  处:《中国煤炭》2011年第5期83-85,共3页China Coal

摘  要:针对煤矿地面储煤场框架受机械伤害后,分析了受损原因,制定出相应的加固修复方案,并介绍该工程施工技术和工艺。实践证明该工程加固效果良好,达到了结构安全、费用和工期减少的整体综合目标。提出类似环境建筑设计方案的几点建议。To cope with the mechanical damage of coal storage framework in the ground of coal mines,the paper analyzes the reasons of damages,proposes correspondent plan for rehabilitation and reinforcement,and introduces the construction techniques for the project.It is proved that the project has a good effect for reinforcement,and reaches the comprehensive target of safety construction and reduction of cost and project time.The author also put forward some suggestion for similar plan of environment architecture design.

关 键 词:储煤系统 储煤场框架柱梁 加固修复 

分 类 号:TD564[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象