电厂循环水取排水工程盾构法施工穿越海/江防大堤沉降控制  

The Subsidence Control of the Power Plant Circulating Water Draining Engineering Shield Construction Across the Sea/River Defense Dike

在线阅读下载全文

作  者:郑辉 

机构地区:[1]山东诚信工程建设监理有限公司,济南市250100

出  处:《电力建设》2011年第5期107-110,共4页Electric Power Construction

摘  要:沿海/江发电厂循环水取排水盾构施工工艺的最大难点是掘进施工需穿越防汛大堤,如控制不好会造成防汛大堤局部沉降。根据上海某电厂2×1000MW机组循环水取排水工程的特点,制定了盾构法隧道施工穿越海防大堤的沉降控制措施,有效地控制了大堤沉降。The most difficult point of the power plant across sea/river circulating water taking catchment engineering shield construction craft is that excavation construction needs to cross the defense dike,which can cause partly dike subsidence without proper control.Based on the characteristics of the circulating water draining engineering from one 2×1000 MW unit in a power plant in Shanghai,the subsidence control measures by the shield construction method was drawn up,which can control the subsidence of dike effectively.

关 键 词:盾构施工 穿越海/江防大堤 沉降控制 循环水 取排水 

分 类 号:TM621.72[电气工程—电力系统及自动化] TU434[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象