岩锚梁混凝土施工期原型温度试验的反演分析  被引量:2

Back Analysis of Prototype Temperature Test in Construction Period of Rock Anchor Beam Concrete

在线阅读下载全文

作  者:吉顺文[1] 孙冬海 陈守开[3] 

机构地区:[1]浙江省水利河口研究院,浙江杭州310020 [2]黑龙江农垦勘测设计研究院,黑龙江哈尔滨150090 [3]华北水利水电学院,河南郑州450011

出  处:《华北水利水电学院学报》2011年第2期60-63,共4页North China Institute of Water Conservancy and Hydroelectric Power

基  金:国家自然科学基金资助项目(50779010)

摘  要:依托某地下厂房岩锚梁工程,对首先浇筑的岩锚梁施工段进行温度试验,利用实测数据,采用改进遗传算法和理论上准确的含冷却水管三维有限元温度场计算方法,进行温度场的反演分析,获取混凝土绝热温升曲线和不同材料的表面热交换系数,并验证了结果的合理性,为后续岩锚梁施工的仿真分析提供条件.Based on the anchor beam project of an underground workshop,the temperature test was carried out for the construction section of rock anchor beams poured firstly.Using the measured data,the back analysis of temperature fields was conducted to obtain adiabatic temperature curves of the concrete and heat-exchange coefficients of different materials using the improved genetic algorithm and theoretically accurate calculation method of three-dimensional finite element temperature field containing cooling water pipes,and the rationality of the results was verified which provided the conditions for the simulation analysis of the subsequent construction of rock anchor beams.

关 键 词:岩锚梁 原型试验 反演分析 温度 热学参数 混凝土 

分 类 号:TV731.6[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象