泸定水电站粘土心墙堆石坝设计  被引量:1

Design of Luding Rockfill Dam with Clay Core Wall

在线阅读下载全文

作  者:王党在[1] 金伟[1] 王方亮[1] 韩勇[1] 

机构地区:[1]中国水电顾问集团成都勘测设计研究院,四川成都610072

出  处:《水力发电》2011年第5期14-16,共3页Water Power

摘  要:泸定水电站粘土心墙堆石坝最大坝高79.50 m,坝址地震烈度高,距下游泸定县城2.5 km。坝基覆盖层深厚,层次结构复杂,最大深度达148.6 m。考虑工程的重要性及复杂性,为确保大坝安全可靠,从大坝结构、筑坝材料、坝基处理、灌浆廊道、防渗墙等方面进行了精心设计。The rockfill dam with clay core wall in Luding Hydropower Station is 2.5 km upstream of Luding City. The maximum height of darn is 79.5 m and the dam locates on high seismic intensity area. The overburden under dam has a maximum depth of 148.6 m and has a complex layered structure. After considering the importance and complexity of the engineering, the dam structure, constructing materials, foundation treatment, grouting gallery and cut-off wall are well- designed in order to guarantee the safety of the dam.

关 键 词:粘土心墙 堆石坝 结构设计 泸定水电站 

分 类 号:TV641.41[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象