泸定水电站坝基灌浆廊道设计  被引量:3

Design of Dam Foundation Grouting Gallery for Luding Hydropower Station

在线阅读下载全文

作  者:索慧敏[1] 姜媛媛[1] 金伟[1] 王党在[1] 

机构地区:[1]中国水电顾问集团成都勘测设计研究院,四川成都610072

出  处:《水力发电》2011年第5期20-21,共2页Water Power

摘  要:泸定水电站坝基防渗墙顶部设置灌浆观测廊道,河床和右岸灌浆廊道均置于覆盖层上,在左岸岸边与岩基搭接。通过大坝三维应力应变分析,对灌浆廊道结构缝分缝位置进行了分析研究。同时,详细介绍了廊道结构缝止水设计及抗渗、抗裂措施。A grouting gallery is arranged on the top of darn foundation cutoff wall in Luding Hydropower Station. The right and river-bed sections of grouting gallery are arranged on the deep overburden and the left section is lapped on the let~ rock foundation. By three dimensional dam stress and strain analysis, the structural joint positions of the grouting gallery are studied. The water stop design for the structural joints and the measures on crack resistance and seepage control are also introduced in detail.

关 键 词:灌浆廊道 结构缝 止水 抗裂 抗渗 泸定水电站 

分 类 号:TV222[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象