风云三号卫星接收天线过顶盲区跟踪实现  被引量:3

A Study on Zenith Blind Zone Tracking of FY-3 Meteorological Satellite Antenna

在线阅读下载全文

作  者:任立清 王罡 

机构地区:[1]乌鲁木齐气象卫星地面站,乌鲁木齐830011

出  处:《现代雷达》2011年第5期67-69,76,共4页Modern Radar

摘  要:采用12 m A-E天线座架的气象卫星接收系统在跟踪运行于太阳同步轨道的风云三号气象卫星时,方位角误差随着俯仰角的增大而不断增大,到天顶区域已无法满足跟踪要求。为了解决卫星站过顶盲区问题,在接收天线上增加机械倾斜第三轴,通过分析计算,提出了实用的软件处理方法。实际运行情况表明,此方法较好地解决了过顶跟踪的目标丢失问题。When tracking the FY-3 meteorological satellite in sun-synchronous orbit, the error of aximuth of the satellite reception system, which use 12 meters A-E antenna, is increased with the rising of elevation angel. In the overhead area, the reception sys- tem can not satisfy the tracking demand. In order to solve the zenith blinde zone problem, the mechanical tilt third axi is added in the antenna, and designed tilt overhead tracking control software according to theoretical analysis and calculation. Practical experi- ment shows that this method has solved the tracking zenithal targets effectively.

关 键 词:风云三号气象卫星 过顶盲区 自动倾斜 

分 类 号:TN827.2[电子电信—信息与通信工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象