检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙建超[1] 杨金明[1] 齐国红[1] 姚勇[1] 王杨[1] 杜文博[1] 宋涛[1] 迟铃泉[1] 孙慧中[1]
出 处:《建筑结构》2011年第6期6-13,共8页Building Structure
摘 要:中国国家博物馆改扩建工程新馆主体结构采用钢筋混凝土多筒体-部分框架结构体系,楼层及屋顶大跨部分采用钢桁架结构。根据材料优缺点、施工特点等进行多方案分析比较,确定展厅、报告厅、演播室等楼盖结构选用后张有粘结预应力混凝土梁,钢桁架结构楼层采用钢筋桁架组合楼板。根据基础受力特点,经方案比选,新建部分基础采用桩筏基础,并进行了地基基础沉降协调分析,采用桩底桩侧后压浆技术大幅提高了单桩承载力,节约造价明显。在工程中采用了型钢混凝土结构以及钢板混凝土组合剪力墙等组合结构。设计中进行了抗震性能化分析以及型钢混凝土结构连接节点等分析研究。The new part of National Museum of China applied a multi-tubes and part of frame structure system,which is consisted by reinforce concrete structure for body,and steel truss for large span structure.The post-tensions prestressed beams are disposed for large space such as exhibition halls,reporting halls and studios,while the steel truss floors are formed by steel bar truss deck.Piled raft system is implemented as the foundation after settlement coordination analysis,furthermore,the loading capacity of piles are improved by post-grouting in the bottom and sides of piles.Nevertheless,the project processes a number of advanced engineering technologies including performance-based seismic analysis,the steel-stiffen connecting node,the stiffen structure and steel plate concrete composite wall to enhance the structure performance.
关 键 词:中国国家博物馆 多筒体-部分框架结构体系 组合结构 钢板混凝土组合剪力墙 抗震性能化分析 地基基础沉降协调分析
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.116