检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国家电力监管委员会电力可靠性管理中心,北京100761
出 处:《中国电力》2011年第6期71-77,共7页Electric Power
摘 要:通过对2010年全国220 kV及以上电压等级输变电设施可靠性分析,特别是对220 kV、330 kV、500 kV变压器、断路器、架空线路3类主要输变电设施的计划停运及非计划停运方面的分析,从技术及责任原因中找出影响其运行可靠性的薄弱环节,并通过设备型式、部件分析、进口与国产设备指标对比,找出了可靠性的变化趋势,为规划、设计、施工、生产等各环节电力企业制定确保输变电设施可靠性有效措施提供参考依据。According to the statistics on reliability indices of nation-wide 220 kV and the above power transmission and transformation facilities in 2010, especially operation data of three main kinds of power transmission and transformation facilities, namely transformer, circuit breaker and overhead line, the main influencing causes of scheduled and unscheduled outages were analyzed and evaluated. Through the analysis of reliability indices in recent years, the reliability changing tendency was discussed, which provided the beneficial basis for improving the reliability of power transmission and transformation facilities in the coming years.
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145