平煤二矿储装运系统优化升级改造  被引量:1

Optimization,Upgrading and Reconstruction of Storage,Loading and Transportation System in Pingdingshan No.2 Mine

在线阅读下载全文

作  者:梁祖军 

机构地区:[1]中平能化平煤股份二矿,河南平顶山467000

出  处:《煤炭工程》2011年第6期63-64,共2页Coal Engineering

摘  要:针对平煤股份二矿生产运输系统比较单一的现状,进行了更换井下胶带运输设备,新建煤仓及矸石仓,调整运输线路及运输时段,地面新建筛选系统等改造,实现了己庚煤炭分储分运分销。文章介绍了如何在不影响正常生产的情况下成功完成储装运系统的优化升级改造,达到了保证安全生产的目的。According to the unitary status of the production transportation system in No. 2 Mine of Pingdingshan, the underground mine belt conveyor equipment was replaced, the coal bunker and coal reject bunker were constructed, the transportation route and transportation time schedule were adjusted, a new screening and preparation system was build with other reconstructions. Thus the separated storage, separated transportation and separated sales for coal from Ji seam and Geng seam was conducted. The paper introduced how to successfully complete the optimized upgraded reconstruction of the storage, loading and transportation system under the condition of no interference to the mine normal production to ensure the target of the safety production.

关 键 词:储装运系统 胶带运输设备 升级改造 设计 分储分运分销 

分 类 号:TD42[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象