典型110kV变电站自动化改造方案  

RENOVATION PROJECT FOR INTEGRATIVE AUTOMATION OF TYPICAL EXISTING 110kV SUBSTATION

在线阅读下载全文

作  者:马丽英[1] 王毅敏[1] 赵铭凯[2] 

机构地区:[1]太原电力高等专科学校 [2]太原理工大学

出  处:《电网技术》1999年第8期55-57,68,共4页Power System Technology

摘  要:电力系统中已运行多年,目前仍起着重要作用的一大批变电站,如何通过改造实现自动化,做到高效、经济、实用,已成为一亟待解决的问题。文章结合典型110kV变电站的具体情况,提出了旧站改造的基本原则、主要思路及技术功能要求等,以最终实现全变电站自动化。In China there are a lot of existing substations which have been put into operation for many years and are still playing important part in power systems at present. To realize the integrative automation in these substations through technical renovation is an urgent task in which the high efficiency, high technical indices and less investment are the basic problems having to be considered. Combining concrete situations of existing typical 110kV substations, in this paper the basic principles of technical renovation, essential considerations, technical requirements and indices which must be achieved are put forward.

关 键 词:变电站 自动化改造 电力系统 改造方案 

分 类 号:TM63[电气工程—电力系统及自动化] TM76

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象