检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]太原电力高等专科学校 [2]太原理工大学
出 处:《电网技术》1999年第8期55-57,68,共4页Power System Technology
摘 要:电力系统中已运行多年,目前仍起着重要作用的一大批变电站,如何通过改造实现自动化,做到高效、经济、实用,已成为一亟待解决的问题。文章结合典型110kV变电站的具体情况,提出了旧站改造的基本原则、主要思路及技术功能要求等,以最终实现全变电站自动化。In China there are a lot of existing substations which have been put into operation for many years and are still playing important part in power systems at present. To realize the integrative automation in these substations through technical renovation is an urgent task in which the high efficiency, high technical indices and less investment are the basic problems having to be considered. Combining concrete situations of existing typical 110kV substations, in this paper the basic principles of technical renovation, essential considerations, technical requirements and indices which must be achieved are put forward.
分 类 号:TM63[电气工程—电力系统及自动化] TM76
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222