长武县机井配套潜水电泵综合装置技术改造研究  

Technical Improvement of Submersible Pump of Pumping Well in Changwu County

在线阅读下载全文

作  者:尚建国 

机构地区:[1]长武县水土保持工作站,陕西长武713600

出  处:《杨凌职业技术学院学报》2011年第2期16-18,共3页Journal of Yangling Vocational & Technical College

摘  要:长武县机井配套潜水电泵选型不当,剩余扬程多,致使装置运行工况点偏离高效区较远,低效高耗;为此,组织人员,对试区机组进行现场抽水测试,根据额定扬程与选用扬程的差值大小,选择了三种潜水电泵综合装置技术改造方法:维修保养;变级改造,同时维修保养;变径改造,同时维修保养。试区采取综合措施改造后,流量平均由29.45 m3/h提高到32.88 m3/h,能源单耗平均由10.53 kWh/(kt.m)降低到6.62 kWh/(kt.m),综合装置效率由28.59%提高到41.90%,节能32.1%。Improper selection of submersible pump of Changwu pumping well leads to surplus head,resulting in operating point far deviated efficient range,low efficiency and high consumption,so we drew water to test for the submersible pump.According to the head and the differences of head,three technical alteration means of submersible pump were chosen: maintenance;reconstruction while grade-changing,diameter-changing while maintenance.After the reconstruction,the average flow increased from 29.45 m3/h to 32.88 m3/h,unit fuel consumption reduced from 10.53 kWh/(kt·m) to 6.62 kWh/(kt·m),the efficiency of the device increased from 28.59%to 41.90%,saving fuel by 32.1%.

关 键 词:井灌区 潜水电泵 泵站改造 

分 类 号:TV533[水利工程—水利水电工程] TH31[机械工程—机械制造及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象