黄河龙口水利枢纽主要技术问题与对策  

Main Technical Problems and Measures for Longkou Water Control Project on Yellow River

在线阅读下载全文

作  者:陆宗磐[1] 余伦创[1] 门乃姣[1] 

机构地区:[1]中水北方勘测设计研究有限责任公司

出  处:《水利水电工程设计》2011年第2期4-6,28,共4页Design of Water Resources & Hydroelectric Engineering

摘  要:龙口水利枢纽为万家寨枢纽的配套工程,主要任务是发电和对万家寨电站调峰流量进行反调节。对龙口工程防沙排沙、大坝深层抗滑稳定、泄水建筑物消能防冲和厂房下部结构设计等主要技术问题进行了研究。针对其特殊的地形地质条件和泥沙问题,采用以底孔为主的泄洪排沙型式,在电站坝段布置排沙洞保证电站进口"门前清"。根据大坝深层抗滑稳定需要,泄水建筑物消能采用二级消能方式,并在坝基设置齿槽、预应力锚索加固尾岩和横缝部分灌浆等工程措施,有效解决了大坝深层抗滑稳定问题。Longkou Water Control Project is an accessory part of Wanjiazhai Water Control Project.The main task is power generation and peak flow reregulation of Wanjiazhai power station.This text studies the technical problems on sand scouring,deep level stability against sliding of dam,energy dissipation and erosion control of water release structure and lower structure design of powerhouse.Subject to the problems of topographic and geological conditions and sediment accumulation,scouring and flooding by giving priority to bottom outlet is adopted,and scouring sluice is arranged to guarantee clear of the inlet of power station.According to the need of deep level stability against sliding of the dam,two-stage energy dissipation is adopted for water release structure,and measures of setting groove at dam foundation,strengthening rock with prestressed anchor,grouting to transverse joints are taken.

关 键 词:反调节 排沙设施 抗滑稳定 消能防冲 厂房 龙口水利枢纽 

分 类 号:TV61[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象