机构地区:[1]安徽理工大学能源与安全学院,安徽淮南232001 [2]煤矿安全高效开采省部共建教育部重点实验室,安徽淮南232001
出 处:《煤炭科学技术》2011年第6期30-32,128,共4页Coal Science and Technology
基 金:国家自然科学基金资助项目(51004003;50974004);安徽高校省级自然科学研究重点资助项目(KJ2010AO91)
摘 要:针对低透气性突出煤层钻孔抽采瓦斯难、石门揭煤速度缓慢等问题,研究了低透气性煤层深孔预裂爆破卸压增透的防突机理,通过理论分析、深孔预裂爆破药柱研发及现场试验相结合的方法,测试了淮南矿区某矿东四采区B组5-2煤层深孔预裂爆破煤层松动半径;依据此参数,优化设计了5-2煤层抽采钻孔和爆破孔。结果表明:在低透气性突出煤层实施深孔预裂爆破增透技术措施后,煤体的弹性潜能得到有效释放,煤层瓦斯压力梯度降低,有效消除了激发突出的应力,煤层的透气性系数提高了123倍,煤层瓦斯抽采纯量比爆破前提高了6~9倍,石门揭煤时间大幅缩短,仅为47 d,比传统的揭煤方法揭煤时间缩短近2个月,为采掘正常接替提供了保证。According to the difficult borehole gas drainage in the low permeability outburst seam,the slow seam opening speed of the crosscut and other problems,the paper had a study on the outburst prevention mechanism of the pre-cracking blasting and permeability improvement with the deep boreholes in the low permeability seam.With the theoretical analysis,the research and development of the deep borehole pre-cracking blasting explosive cartridge and the site test combined method,the pre-cracking blasting vibration radius with the deep boreholes in No.5-2 seam of the Dongsi district B group of a mine in Huainan Mining Area was measured.Based on the parameters,the gas drainage boreholes and the blasting boreholes in No.5-2 seam were optimally designed.The results showed that after the pre-cracking blasting and permeability improvement technical measures with the deep boreholes completed in the low permeability outburst seam,the elastic potential of the seam was effectively released,the gas pressure gradient of the seam was reduced and the excitation outburst stress was effectively eliminated.The permeability coefficient of the seam was increased by 123 times and the pure quantity of the gas drainage from the seam was improved by 6~9 times higher than before the blasting operation completed.The seam opening time of the crosscut was highly reduced and was only 47 days which was reduced about two months faster than the seam opening time with the conventional seam opening method and could ensure the normal replacement of the mining and excavation operations.
分 类 号:TD712[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229