检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林文泉[1]
机构地区:[1]中铁第四勘察设计院集团有限公司,武汉430063
出 处:《铁道建筑技术》2011年第5期43-46,共4页Railway Construction Technology
摘 要:结合昆明市轨道交通首期工程高架区间桥梁墩、梁外形方案设计,介绍了高架桥影响城市景观的主要因素。基于该城市景观要求,提出了适合昆明市城市特色的4种高架桥梁设计方案,并通过广泛征求意见确定山茶花方案,最后对所确定的山茶花方案的桥墩及箱梁进行了技术经济分析。分析表明,昆明市高架桥方案的桥墩在高地震烈度要求下,仍能满足节约的经济技术指标要求;而该方案箱梁技术指标相对较高,但在不考虑景观需求的前提下,其技术经济指标可达到全国其他城市同类结构的平均水平。Combining with the landscape schematic design of first stage bridge piers and bridge beams in the Kunming city,the main landscape factors of rail transit viaduct are introduced.Among the four design schemes suitable for Kunming City',the camellia scheme is selected as the final scheme through the public opinion poll.In addition,the technical economic analysis of pier and box-girder in the final scheme is carried out.The results show that the piers in the Kunming's viaduct scheme can meet the requirements of saving technical economic index in intense earthquake.The techinical index of box-girders is higher than that of other cities.Put landscape requirement aside,the technical economic index of box-girders is able to reach the national average level among similar products.
分 类 号:U442.5[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117

