机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021
出 处:《东北水利水电》2011年第6期4-6,71,共3页Water Resources & Hydropower of Northeast China
摘 要:根据电站装机规模及双回66 kV电压接入电力系统的条件,经过综合技术经济比较,最后确定技术上可行,经济上合理的主接线方案。发电机变压器组合采用发电机主变压器组成三机—变扩大单元接线,从两段发电机电压母线上各取一回厂用电电源;66kV侧采用变压器—线路组(带备用断路器)接线。Based on the installed capacity of hydroelectric power station and the condition of the double circuit transmission of 66kV voltage to connect power system,the paper puts forward the main wiring scheme with viable technology and reasonable economy through the comparison of technology and economy.The scheme is that taking combination of generator and main transformer as three generators and one transformer to expand unit connection,power supply from two voltage buses of generator separately to plant,transformer-line block(back-up circuit breaker) at the side of 66kV.
分 类 号:TV734.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222