作 者:王雁军[1]
出 处:《国防交通工程与技术》2011年第3期52-53,63,共3页Traffic Engineering and Technology for National Defence
摘 要:TBM施工期间在隧道内维修更换主轴承部件非常困难。介绍了首次在洞内修复、更换主轴承耐磨环的思路、工作程序、实施办法和注意事项。通过正确决策和合理组织施工,比预定工期大大缩短,迅速恢复了掘进,效果良好。Since it is very difficult to repair or replace components of the main bearing inside the tunnel during the construction of TBM,a proposition of repairing or replacing the wear-resisting ring of the main bearing for the first time inside the tunnel is put forward in the paper,with its working procedures and methods for implementation,and points for attention introduced.Through the correct decision-making and the rational organization of construction,the scheduled duration is greatly shortened,the normal excavation soon restored,and very good effects achieved.
分 类 号:U455.31[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28