Technical research on control of caisson construction for the middle tower foundation of Taizhou Bridge  

Technical research on control of caisson construction for the middle tower foundation of Taizhou Bridge

在线阅读下载全文

作  者:Liu Jianbo Yang Yanhua Zhang Yongtao Du Song 

机构地区:[1]Key Lab of Large-Span Bridge Construction Technology, Ministry of Communication,Wuhan 430014, China

出  处:《Engineering Sciences》2011年第2期9-13,45,共6页中国工程科学(英文版)

基  金:National Science and Technology Support Program of China ( No. 2009BAG15B02);Key Programs for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-150)

摘  要:The real-time informational monitoring system is adopted in the construction of middle tower foundation of Taizhou Bridge for the first time. The geometric state of the caisson, the stress of upstream and downstream anchorage cables, underwater topography, the drag forces of the caisson cutting edge and frictional resistances of the sidewall and etc. are monitored in real time. According to the synthesized data analysis and decision-making system, the spatial states of the caisson are adjusted in time to locate and embed the deep water caisson precisely. The offset error of the caisson is less than 30 cm and the vertical error is 1/363 at the final stage. The control technology for construction of large caisson under deep water is concluded and would be helpful for the construction of bridge foundation in the future.

关 键 词:Taizhou Bridge caisson foundation control technology real-time monitoring system 

分 类 号:TP311.52[自动化与计算机技术—计算机软件与理论] U448.35[自动化与计算机技术—计算机科学与技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象