检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]Jiangsu Provincial Yangtze River Highway Bridge Construction Commanding Department (JPCD), Taizhou, Jiangsu 225321, China [2]Nanjing Transportation Engineering Co.Ltd.,Nanjing 210000, China
出 处:《Engineering Sciences》2011年第2期14-19,共6页中国工程科学(英文版)
基 金:National Science and Technology Support Program of China ( No. 2009BAG15B02) ;Key Programs for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-150)
摘 要:According to the construction method of Taizhou Bridge, numerical simulation is conducted to analyze the vibration of caisson under wind and water flows to determine the main factors of the caisson vibration. Meanwhile, the localization system of caissons and anchors of Taizhou Bridge is modeled in order to summarize the vibration mechanism of caissons under deep-water and jet-flow condition, and further pertinent vibration-control measures are proposed. The obtained results are well verified in engineering practice, and consequently the safety risk of positioning the caisson is reduced.
关 键 词:Taizhou Bridge caisson foundation sensitivity analysis vibration mechanism vibration control methods
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117