检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Zhao Yanrong Zhou Zhifang Ruan Jing
机构地区:[1]School of Earth Sciences and Engineering, Hohai University, Nanjing 210098,China
出 处:《Engineering Sciences》2011年第2期26-32,共7页中国工程科学(英文版)
基 金:National Science and Technology Support Program of China ( No. 2009BAG15B02) ;Key Pro-grams for Science and Technology Development of Chinese Transportation industry ( No. 2008-353-332-160) ;Jiangsu Province College Graduate Research and Innovation Program ( No. CX08B_123Z) ;2009 Natural ScienceFoundation of Hohai University ( No. 2009424011);the Fundamental Research Funds for the Central Universi-ties ( No. 2009B11814)
摘 要:A caisson foundation is applied to the north anchorage of Taizhou Yangtze River Highway Bridge of which the initial caisson sinking requires dewatering. Since the caisson foundation is quite close to nearby buildings, a system control model is established with source (sink) distribution and intensity being the object function, minimum requirements of settlement and deformation of surroundings caused by dewatering and dynamic water levels during different working procedures being constraints, and the design parameter of pumping wells being the variable,so as to lower the jeopardizing of surrounding buildings, which provides a new method for active control over settlement during dewatering. Such a method of dewatering based on system control model should be of significance for similar projects involving dewatering.
关 键 词:Taizhou Bridge caisson of north anchorage construction dewatering system control model
分 类 号:TU473.2[建筑科学—结构工程] U448.145.4[建筑科学—土工工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117