沉箱码头后方棱体结构的优化设计及主要施工工艺  被引量:10

Optimized Design and Main Construction Technology of Rear Prism of Caisson Wharf

在线阅读下载全文

作  者:赵辉[1] 

机构地区:[1]唐山港口实业集团有限公司,河北唐山063611

出  处:《港工技术》2011年第2期34-36,共3页Port Engineering Technology

摘  要:常见重力式沉箱结构码头岸边装卸机械的前、后轨道梁分别坐落于码头胸墙和沉箱后方的抛石棱体上,由于胸墙和抛石棱体的后期沉降量不同,在使用期常会发生后轨道梁低于前轨道梁的情况,是重力式码头普遍存在的问题。在唐山港京唐港区25万t级矿石码头工程实践中,通过对沉箱后方减压棱体结构的优化设计,探讨沉箱码头后轨道梁沉降通病的解决方案,并简要说明优化后的减压棱体和倒滤层的主要施工工艺。In the normal gravity caisson wharf,the front and rear rail girders are located at wharf breast wall and riprap prism in the rear of caisson respectively.Due to the different sedimentation of breast wall and riprap prism at later period,the rear rail girder is lower than the front one in operation,which always happens in gravity wharfs.In 250,000DWT ore terminal project of Jingtang Port Area of Tangshan Port,by optimizing the design of pressure-relief prism in the rear of caisson,the solution to the rear rail girder sedimentation of caisson wharf is discussed.In addition,main construction technologies of the optimized pressure-relief prism and inverted filter are briefly described.

关 键 词:沉箱码头 后方棱体 倒滤层 优化 施工工艺 

分 类 号:U656.111[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象