用综合系数法评价爆破震动作用下巷道稳定性  被引量:1

Evaluation of Tunnel's Stability under Blasting Vibration Using Comprehensive Coefficient Method

在线阅读下载全文

作  者:吴贤振[1] 游勋[1] 冯锐[1] 袁锦锋 

机构地区:[1]江西理工大学资源与环境工程学院,江西赣州市34100 [2]安徽马钢罗河矿业有限责任公司,安徽巢湖市231562

出  处:《矿业研究与开发》2011年第3期72-75,共4页Mining Research and Development

摘  要:为保障爆破震动作用下巷道的安全与稳定,采用Blastmate III测振仪对铜坑矿生产爆破现场进行了爆破震动监测测试,结合测试结果采用综合系数法对巷道的稳定性进行了评估,得到了不同综合系数K值下满足巷道稳定的最大单段药量计算公式,提出了合适的爆破方式及支护形式。其评价分析方法和结论对相似矿山具有一定的参照意义。In order to ensure the safety and stability of the underground tunnel under blasting vibration,the blasting vibration was monitored with Blastmate Ⅲ vibration measurer in the production site of Tongkeng mine.Based on the test results,the stability of the underground tunnel was evaluated with comprehensive coefficient method,a calculation formula of Maximum charge in one delay time for ensuring the stability of underground tunnel under different comprehensive coefficient K-value was presented,and appropriate blasting methods and supporting pattern were proposed.The evaluation method and conclusions are of reference value to some similar mines.

关 键 词:综合系数法 爆破震动 巷道稳定性 单段最大药量 

分 类 号:TD235[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象