检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水力发电学报》2011年第3期191-194,共4页Journal of Hydroelectric Engineering
基 金:国家自然科学基金雅砻江水电开发联合研究基金项目(50539130)
摘 要:随着我国大规模水电开发的快速推进和社会环境的变化,水电开发中涉及的征地移民问题日渐复杂,已逐渐成为制约水电开发的重要因素之一。本文结合目前水电开发征地移民实践中的一些关键问题,对水电开发征地移民政策和管理环境进行了分析和探讨。为促进水电发展,本文提出了切实贯彻实施"先移民、后建设"政策,进一步建立移民利益共享机制等建议。As hydropower deveolpment advances rapidly and social environment changes significantly in recent years,reservoir resettlement is more complicated and is gradually becoming one of the important issues that may restrict the hydropower development in China.In this paper,key issues in resettlement practices as well as the related policy and management environment are analyzed and discussed.To promote hydropower deveolpment,it is suggested that the policy of resettlement before construction should be put into effect,and a mechanism of later-emigrant support and benifit sharing should be established.
分 类 号:TV867[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.208